February 7/8th, 2002Archeops was flying !!! |
Successful launch at
12h44 UT with a 400Z
Flight between 4 hPa and 5 hPa
Online trajectory |
Predicted trajectory |
Ephemerids |
Anticipated sky coverage |
D day - morning |
On the launchpad |
The launch |
After the launch |
00:20 AM Birth of Alain's
first grand-daughter. Congratulations to the parents !
08:15 AM He transfer OK
09:20 AM Flight confirmed with
19
hours at ceiling, at 4 hPa
10:00 AM Ballast filling
OK - T Ge < 87 mK, T pf < 95 mK
11:10 AM Auxilliary balloons
attached
11:30 AM Gondola moved
on
the launchpad - T Ge = 95 mK, T pf = 97 mK
12:10 AM Installation of
the
balloon on the launchpad - T Ge = 88 mK, T pf = 96 mK
01:20 PM Balloon
inflated -
T Ge <87 mK, T pf < 95 mK
01:44 PM Successful
launch
!
03:41 PM Valve gate
opened
- gondola rotating nominally - T Ge = 91 mK, T pf = 98 mK - we can see
the
dipole and the Galaxy
07:00 PM Too many people
follow
the Archeops trajectory: the PC failed (recovered now) - T Ge = 83 mK,
T
pf = 91 mK
Two beautiful movies of the Archeops launch
and flight
are available, thanks to our MIPAS friends (11 Mo each).
02:50 AM The Ural mountains
are
passed, according to the predicted trajectory at 5 hPa - all the
ballast is
kept for the day/night transition - T Ge = 82 mK, T pf = 98 mK
04:45 AM Archeops is
seeing
the sunrise.
07:36 AM Ballast 30 kg
09:45 AM Series of 30 kg
ballast
to compensate the day/night transition. You can find here the ephemerids computed with the actual
trajectory
10:40 AM Valve gate
closed
...
Daily reports from
Kiruna with pictures (February 2002)
Computed trajectories for Archeops (February 2002)